Product
Litigation
- Early Case Assessment
- Evidence Analysis
- Web Search
- Document Review
- Production Setup
- Connectors (Upcoming)
- Legal Research (Upcoming)
Transactional
- Contract Review
- Contract Intelligence
- Word Add-In
- Web Search (Upcoming)
- Connectors (Upcoming)
- Legal Research (Upcoming)
Solutions
Litigation
- Early Case Assessment
- Investigations & Subpoenas
- Trial Preparation
- Enterprise eDiscovery
- Cloud eDiscovery
Transactional
Who it’s for
Resources
Learn
Customers
Events & CLE
Map each SOW deliverable to its controlling specification, a verifiable acceptance test, required evidence, authorized approver, and contractual review process. Then connect that process to rejection, correction, retesting, and payment. The resulting deliverables and acceptance tracker should show what the supplier promised, how the customer can verify performance, and which events could trigger acceptance before testing finishes. Keep contractual requirements separate from proposed improvements: an internal test does not become a supplier obligation merely because counsel records it in the tracker.
When to use this workflow
Use this workflow when customer-side counsel reviews a draft SOW, a change order affecting acceptance, or a milestone whose completion criteria are unclear. It suits implementation, development, migration, and consulting engagements where delivering a file or performing an activity does not necessarily demonstrate satisfactory completion.
The scope is acceptance mapping, not a complete commercial review. Examine precedence, dependencies, warranties, change control, and payment where they affect acceptance. This guide assumes US private commercial contracting without a specified governing state law. Rights depend on the agreement, governing law, facts, and deal context. The filed agreements below illustrate wording, not default rules or market standards; the workflow recommendations are not legal mandates.
What you need
Collect the proposed or executed SOW, master agreement, amendments, purchase order, specifications, test plans, and incorporated schedules. Record document IDs, versions, execution status, and unavailable attachments. Include referenced project documents so counsel can assess their contractual status rather than assuming incorporation.
Obtain the milestone fee schedule, delivery timetable, customer cooperation duties, defect classifications, and proposed approval authority. Ask the technical owner what evidence would establish satisfactory performance and whether the review window allows that evidence to be collected.
Have the customer's dated negotiation checklist and approval thresholds available. Keep preferred positions, authorized fallbacks, and existing supplier obligations distinct. Identify who can approve technical criteria and who can authorize contractual acceptance.
Use the template
Use Statements of Work — Deliverables and acceptance tracker. You can copy this table into your working document or spreadsheet. Create one row per independently testable deliverable or acceptance condition; repeat the deliverable ID where several conditions apply.
| Item / source | Deliverable / boundary | Criterion / test | Evidence / environment | Approver / dependency | Window / notice | Cure / payment | Gap / action / owner |
|---|---|---|---|---|---|---|---|
In Item / source, record the document ID, version, and clause, page, or specification cell. Include separate references for scope, acceptance, and payment when they appear in different documents. Retain short exact wording in a linked working note when interpretation turns on it.
In Criterion / test, identify the threshold, method, and status: agreed, proposed, or unresolved. Evidence / environment distinguishes required proof from proof actually received and identifies the build, dataset, or configuration tested.
Window / notice captures the trigger, period, recipient, and notice method. Cure / payment records correction, resubmission, retesting, and affected fees. Gap / action / owner includes the next decision, responsible person, approval status, and decision date. Distinguish “not present in reviewed materials,” “attachment unavailable,” and “not yet verified.”
Step by step
1. Establish which documents control acceptance
Read execution, incorporation, and conflict provisions before reconciling inconsistent criteria. Determine whether a later change order replaces a requirement or supplements it. Do not treat the newest project document as controlling without checking its status.
The NCR-filed Development Services Exhibit requires both parties to execute each SOW; its Appendix 1 places the SOW above the Exhibit and Purchase Agreement in the conflict hierarchy. Those are agreement-specific provisions, not universal precedence rules (NCR, Development Services Exhibit §1.2 and Appendix 1).
Record: controlling references, conflicting language, missing attachments, and an owner for resolving each uncertainty.
2. Separate deliverables from activities and dependencies
Break milestone descriptions into inspectable outputs. “Conduct migration” describes an activity; a migrated dataset and reconciliation report describe possible outputs. Do not characterize those outputs as promised unless the documents support them.
Identify exclusions and customer inputs alongside each deliverable. Testing may depend on credentials, source data, infrastructure, or supplier access. Check the stated consequences of delayed inputs rather than assuming any customer delay excuses all supplier performance.
Record: deliverable boundaries, related milestone, source-backed supplier commitments, customer dependencies, and any proposed scope additions.
3. Translate specifications into verifiable tests
Identify the promised result, measurement method, threshold, test population, and permitted exceptions. For “complete documentation,” propose a contents checklist and verification method for business-owner approval. Where qualitative judgment is necessary, identify the decision-maker and stated review factors.
FAR 37.602(b) calls for federal performance work statements, to the maximum extent practicable, to describe required results and enable assessment against measurable performance standards. This federal acquisition provision supplies only an optional drafting model for private SOWs (FAR 37.602(b)).
Record: the existing criterion, proposed clarification, test method, threshold, and unresolved judgment. Never present a reviewer-created threshold as agreed language.
4. Specify evidence and testing conditions
Connect each criterion to evidence that can demonstrate compliance. For this review, distinguish proof of delivery from proof of performance: receiving files does not answer whether their contents meet the specified requirements. Identify the test environment, software build, dataset, configuration, report, and evidence producer.
Check whether the customer will receive sufficient access and information within the review window. For sampling, define the proposed population, selection method, and treatment of failures. Avoid treating a successful sample as proof of untested requirements.
Record: required evidence, producer, environment identifiers, access gaps, and whether testing remains unperformed. At draft stage, record evidence requirements—not invented results.
5. Trace every route to acceptance
Read beyond the acceptance heading. Check silence, production use, partial deployment, supplier certification, and other potential triggers. Distinguish technical confirmation from contractual acceptance and identify the authorized approver.
The ICE-filed SOW illustrates alternative deemed-acceptance triggers: five business days without an approver response, material conformity, or production deployment regardless of whether acceptance criteria are met. Its wording expressly preserves Services Warranty claims (ICE SOW, Acceptance of Materials—Acceptance).
Record: every trigger, starting event, day definition, and approval requirement. Verify whether delivery must include all required materials. Leave response dates unresolved when the trigger date is unknown.
6. Connect rejection to correction, retesting, and payment
Determine whether the customer can prepare a compliant rejection notice using the available evidence. Identify required detail, recipients, delivery method, receipt rules, correction obligations, resubmission procedure, and repeat-failure consequences. Check whether retesting receives a fresh window and whether components can be accepted separately.
The ICE example requires detailed written rejection within its testing period and links acceptance of milestone materials to payment. NCR's Development Services Exhibit §5.4 conditions final payment on acceptance, states acceptance will not be unreasonably withheld, and requires no-charge correction of deficiencies (ICE, Acceptance and Rejection; NCR, Development Services Exhibit §5.4).
Record: notice mechanics, correction and retest terms, affected fees, and unresolved consequences. Keep acceptance remedies separate from surviving warranties.
7. Resolve gaps through coordinated drafting
Prioritize gaps that make testing impractical or trigger payment before meaningful review. Extending the review window may accomplish little if production use independently triggers acceptance. Adding a test may require corresponding changes to access, delivery requirements, and dependencies.
Classify revisions as clarification, additional scope, or unresolved. Apply the agreement's change process. NCR's change-request form separates approval of resources to study a change from authorization to implement it (NCR, Appendix 1, Attachment 1).
Record: proposed language, linked clauses, rationale, decision owner, decision date, and approval status. Before closing review, reconcile the tracker to the approved contractual documents.
Worked example
Fictional scenario: All parties, documents, amounts, and terms in this example are invented. Alder Quay Foods is reviewing Brindle Systems' warehouse migration SOW, F-SOW-03 version 4. Section 3.2 promises migration of the inventory dataset identified in Schedule A; §3.4 requires an operations guide. Schedule A was not supplied. Section 5 allows four business days after delivery for detailed written rejection and independently treats production use as acceptance. Section 6 makes the bundled migration-and-guide milestone fee of $48,000 due upon acceptance.
The customer expects reconciliation and rollback instructions, but neither appears in the reviewed materials. Its operations lead plans a production pilot. No deliverables have been submitted. Rejection recipients, correction obligations, and retest mechanics remain unverified. These are review findings, not agreed amendments or test results.
| Item / source | Deliverable / boundary | Criterion / test | Evidence / environment | Approver / dependency | Window / notice | Cure / payment | Gap / action / owner |
|---|---|---|---|---|---|---|---|
| D1; F-SOW-03 v4 §§3.2, 5–6 | Inventory migration; boundary unknown | Proposed: reconcile agreed source totals; investigate exceptions | Schedule A unavailable; proposed source snapshot and test-run report | Data lead; contractual authority unverified | Four business days after delivery; production use also triggers acceptance | Cure unverified; bundled $48,000 fee | Obtain Schedule A and negotiate pilot treatment before approval; procurement and counsel |
| D2; §§3.2, 5–6 | Reconciliation report; not expressly promised | Proposed: report totals, variances, and dispositions | No report supplied; output requirement proposed | Data lead; needs defined dataset | No separate review process identified | No separate fee; inclusion in bundle unresolved | Decide whether additional scope before redline approval; business owner |
| D3; §§3.4–6 | Operations guide; contents undefined | Proposed: contents review including rollback instructions | Not delivered; proposed checklist tied to deployed configuration | Support lead; acceptance authority unverified | Same §5 process; notice recipient unverified | Retest unverified; bundled milestone fee | Agree contents and payment linkage before approval; business owner and counsel |
The mapping changes the negotiation priority. Counsel must address the planned pilot alongside the testing window because production use is an independent trigger. Missing Schedule A prevents reliable scope review. Reconciliation and rollback requirements need agreement; their absence does not establish a supplier breach. The $48,000 appears across linked rows but represents one bundled fee, not three exposures to add together.
Common mistakes
- Treating a milestone name as a test. Separate sourced outputs from proposed conditions and obtain business approval for new thresholds.
- Leaving acceptance-template instructions unfinished. NCR Appendix 1 §5 instructs the drafter to supply criteria or a test plan and an approval process; the instruction is not a completed test (NCR, Appendix 1 §5).
- Improving criteria while ignoring deemed acceptance. Review use, silence, and partial-delivery triggers together with rejection and payment.
- Treating the tracker as an amendment. Label proposed requirements and obtain the contractual documentation and approvals appropriate to the change.
- Equating unavailable evidence with failure. Distinguish missing attachments, unperformed tests, and demonstrated nonconformity; assign the appropriate response to each.
Final quality check
- Each deliverable and independently testable condition has a row.
- References match the correct document version, clause, and attachment.
- Agreed requirements and proposed tests are visibly distinct.
- Evidence, environment, access, and dependencies permit practical testing.
- All acceptance triggers and approval authorities are captured.
- Notice, correction, retesting, warranties, and payment have been reconciled.
- Shared milestone amounts are identified without double counting.
- Open issues are resolved or assigned an owner and decision date.
Complete the workflow with DecoverAI
DecoverAI is the Legal Intelligence Platform for litigation and transactions. In Word, use contract review with the customer as the represented party and deal-specific instructions addressing deliverables, tests, deemed acceptance, and payment. Findings quote and locate clauses, rank severity, and identify missing language as not present. The lawyer can edit or insert suggestions as ordinary tracked changes in the signed-in Word user's name, or dismiss findings with reasons. Tabular review supports work across multiple documents; the tracker remains your work product, and counsel verifies findings and makes legal judgments. Book a demo to discuss this acceptance-review workflow.
Frequently asked questions
Can one test cover several deliverables?
Yes, where the agreed test addresses each output. Preserve separate rows when dependencies, approvers, or payment consequences differ. Identify whether one component's failure prevents acceptance of the bundle.
What if the SOW promises only reasonable satisfaction?
Record the wording and ask the business owner which review factors matter. Propose defined criteria or an approval process without assuming that the existing phrase has a particular enforceability outcome.
Should production use always be excluded from acceptance?
Treat that as a negotiation decision. Identify pilots, emergency use, and phased deployment, then determine their intended acceptance consequences. Coordinate any carve-out with payment, rejection, and the customer's deployment authority.
Does acceptance eliminate later warranty claims?
Check the agreement rather than assuming the result. The ICE example expressly preserves Services Warranty claims; that protection cannot be presumed elsewhere (ICE SOW, Acceptance). Record the applicable survival language and distinguish acceptance review from warranty coverage.
Sources
- NCR SEC Exhibit 10.1—Development Services Exhibit and Appendix 1: agreement-specific acceptance and change-control wording, plus SOW drafting instructions.
- ICELOUNGE MEDIA SEC Exhibit 10.01—SOW Acceptance of Materials: contractual acceptance, rejection, payment, and warranty example.
- FAR 37.602—Performance work statement: federal acquisition provision, not a private-contract requirement.
This guide is general information about legal workflows, not legal advice for any matter. It was drafted and reviewed with AI assistance. The worked example is fictional. Contract rights and procedure depend on the governing law, the actual wording, and the facts, so check the cited sources and the rules that apply in your jurisdiction before relying on it.