Product
Analyze
Review
Produce
Draft
Solutions
Litigation
- Early Case Assessment
- Investigations & Subpoenas
- Trial Preparation
- Enterprise eDiscovery
- Cloud eDiscovery
Transactional
Who it’s for
Resources
Learn
Customers
Events & CLE
Build an insurance bad-faith chronology around what each decision-maker knew, when information became available, and what happened next. Preserve event, receipt, and claim-file entry dates separately; connect every material proposition to a pinpoint source; and distinguish documented conduct from disputed accounts and counsel’s analysis. The deliverable is a source-linked chronology that identifies investigation gaps, changing coverage or valuation positions, response intervals, and competing explanations. It should direct further verification without treating delay, missing records, or an unfavorable coverage decision as proof of bad faith.
When to use this workflow
Use this workflow when policyholder counsel, insurer counsel, or an in-house litigation team receives a claim file, prepares to examine an adjuster, or tests a pleaded handling theory against contemporaneous records. It is particularly useful when diary entries, emails, expert reports, and payment records present different sequences.
Define the policy type, first-party or third-party posture, governing substantive law, forum, and historical period. A first-party property chronology may center on inspection, valuation, and payment. A third-party chronology may require defense assignments, settlement demands, authority requests, and insured notifications, including the terms and documented receipt of each demand.
Federal rules below concern federal proceedings, not automatically state litigation or arbitration. Policy rights and asserted handling duties require analysis of the actual language, governing law, facts, and applicable historical requirements.
What you need
Start with a source inventory rather than an apparent narrative. Gather:
- Complete policies and endorsements, coverage correspondence, and operative pleadings or demands.
- Claim notices, proofs of loss, estimates, photographs, expert instructions and reports, settlement communications, and payment transactions.
- Native claim-system exports, audit histories, attachments, diary records, assignment changes, and supervisor approvals.
- Relevant broker, vendor, third-party administrator, and insured communications, including receipt evidence.
- Production indexes, Bates ranges, collection limits, and privilege or confidentiality designations.
Identify each source’s repository, custodian, production batch, and version. Preserve originals separately from working extracts. An export showing current diary text may not establish when earlier text was entered or changed.
Keep an issue list beside the chronology: coverage position, alleged unreasonable handling, causation, damages, and asserted defenses. These organize review; they do not establish legal elements. Record which claim, coverage part, and insured each event concerns when one file contains multiple claims.
Use the template
Use the Insurance Bad-Faith Matters — Case chronology template below. You can copy this table into your working document or spreadsheet.
| Event ID | Dates: event / receipt / entry | Actor and role | Event or knowledge | Source pinpoint | Issue and significance | Status or gap | Next action / owner |
|---|---|---|---|---|---|---|---|
Assign stable event IDs so sorting does not break references. Label each date and identify whose receipt is recorded. Use “unknown” rather than borrowing a date from a nearby communication.
“Event or knowledge” should state a narrow factual proposition. “Source pinpoint” should identify the document, page or Bates number, and relevant message, paragraph, or transaction. Preserve original timestamps and time zones where material.
Keep significance analytical rather than presenting inference as fact. Status should distinguish supported, disputed, retrospectively reported, and unverified propositions. Multiple documents may support different parts of one row; identify those relationships. Assign consequential gaps to a person and a specific task. For a collection gap without a known event, label the row “gap” and leave its date unknown.
Step by step
1. Define the chronology’s decision question
Write the question the chronology must answer: for example, whether an insurer received material inspection evidence before maintaining a denial reason. Set boundaries around that question, retaining earlier policy and notice events needed for context.
Avoid turning the chronology into a coverage memorandum. Link the relevant provision, but distinguish the coverage position from the handling conduct under examination. For settlement disputes, define which offer, response, authority decision, or insured communication is at issue.
As a jurisdiction-specific example, the California Department of Insurance’s disaster-adjusting guide describes section 2695.7(d)’s investigation requirements and restrictions on persistent requests for unnecessary or immaterial information. Use it to frame investigation questions, not establish a nationwide standard or private remedy (2026 guide, p. 19). (insurance.ca.gov)
Record: the scope question above the table and an issue tag for each included event.
2. Establish source coverage and collection limits
Reconcile the production inventory with participants and repositories. Look for missing expert attachments, periods without diary entries, administrator records absent from the insurer’s export, and unexplained assignment changes.
Treat absence carefully. “No inspection report located in this production” is supportable; “no inspection occurred” may not be. Include adverse documents and alternative explanations from the outset. Identify whether an apparent gap reflects an incomplete export, a withheld item, or an uncollected repository.
For federal discovery, collection requests should address nonprivileged material relevant to claims or defenses and proportional to the case’s needs under Rule 26(b)(1). Chronological interest alone does not justify unlimited collection. (uscourts.gov)
Record: supported events and labeled gap rows identifying the missing category, repository, and owner.
3. Extract separate events and date types
Use one row per meaningful act or knowledge change: notice received, inspection completed, report transmitted, approval given, denial sent, payment issued, or position revised. Split diary paragraphs containing several events.
Preserve event date, recipient-specific receipt date, and system-entry date. A report dated March 4 does not establish that the adjuster possessed it then. A March 12 diary entry describing a March 6 call is retrospective evidence of that call.
Retain conflicting dates instead of averaging or silently selecting one. Document any time-zone conversion and preserve the original timestamp. If sorting requires a provisional date, label that choice without replacing the recorded uncertainty.
Record: discrete propositions, labeled dates, pinpoint citations, and date-conflict or retrospective-entry flags.
4. Reconstruct knowledge at each decision point
For each denial, valuation change, repeated information request, or settlement response, identify the decision-maker and materials demonstrably available at that time. Distinguish organizational receipt, individual access, and documented review; those are different propositions.
Pair stated reasons with contemporaneous support and contrary evidence. Later explanations belong on their actual dates, not within the original decision’s rationale. Track changes in rationale without assuming that every change establishes misconduct.
Privilege review remains separate from relevance. Federal Rule 26(b)(5)(A) requires express claims and descriptions permitting assessment when otherwise discoverable information is withheld as privileged or protected; it does not establish the protection itself (Federal Rules of Civil Procedure). Restrict sensitive analytical versions and refer mixed legal-business communications to counsel. (uscourts.gov)
Record: actor-specific knowledge, its supporting source, competing evidence, and unresolved review questions.
5. Test response intervals without declaring violations
For each disputed interval, identify the alleged trigger, reliable receipt evidence, requested action, follow-up, and completion event. Label elapsed time as a factual calculation until counsel validates the governing source, historical version, exceptions, and counting method.
Specify what completion means. Issuing a payment, mailing a check, and receiving funds are different events. Scheduling an inspection does not establish that it occurred. A denial letter’s date does not necessarily establish dispatch.
For repeated requests, compare the requested information with what had already been supplied and whether the record supports successful delivery. Keep settlement-demand terms and any documented extensions beside the relevant events rather than assuming a deadline from correspondence dates.
Record: linked start and end event IDs, calculation basis, unresolved endpoints, and legal-validation owner. Link any detailed calculation note.
6. Challenge the narrative against contrary evidence
Read the chronology from both policyholder and insurer perspectives. Test whether apparent inactivity reflects missing records, an outstanding insured response, vendor delay, reassignment, or an unsupported explanation. Require evidence for each account.
Connect gaps to focused tasks: obtain an attachment, inspect audit history, reconcile payments, or ask the adjuster which materials were reviewed. Keep questions about individual recollection distinct from proposed organizational testimony topics.
Separate alleged handling failures from asserted consequences. If delayed investigation allegedly increased repair expense, identify evidence connecting those events; sequence alone does not establish the link. Preserve contrary evidence about intervening causes or unchanged costs.
Record: the strongest competing account, supporting evidence, remaining uncertainty, and next verification task.
7. Verify the working chronology and control later uses
Reopen every material source and check the entry against its full context. Confirm recipients, attachment references, dates, and any quoted text. Have a second reviewer test pivotal decision points where practicable. Record corrections without changing stable event IDs.
Source linkage does not establish admissibility. Federal Rule of Evidence 901(a) requires sufficient authentication evidence; Rule 803(6) separately addresses business-record foundation and trustworthiness. An outside statement placed in a claim file may require additional hearsay analysis (Federal Rules of Evidence). (uscourts.gov)
Record: verification status and assigned evidentiary gaps. Maintain a controlled internal version separately from proposed exhibits or witness-facing extracts, with a clear version date and source set.
Worked example
Fictional scenario: Harbor Lantern Foods submits a first-party property claim to Copper Ridge Indemnity after a refrigeration failure in April 2026. The claimed stock loss is $184,000. A fictional endorsement makes the equipment failure’s cause relevant to coverage. Counsel is testing whether denial preceded consideration of diagnostic evidence, not deciding coverage from the chronology.
The fictional production contains a portal acknowledgment, an adjuster diary, a denial letter, and receipt confirmation. The diagnostic attachment is missing. All parties, documents, amounts, and facts are invented.
| Event ID | Dates: event / receipt / entry | Actor and role | Event or knowledge | Source pinpoint | Issue and significance | Status or gap | Next action / owner |
|---|---|---|---|---|---|---|---|
| E-014 | Event Apr. 8, 2026; portal acknowledgment Apr. 8; entry unknown | Insured’s manager | Portal acknowledged diagnostic-report.pdf | FIC-021, p. 2, receipt 447 | Possible diagnostic submission before denial | Filename acknowledged; contents, routing, and adjuster access unknown | Obtain attachment and access history / associate |
| E-019 | Reported event Apr. 11, 2026; receipt unknown; entry Apr. 14 | Assigned adjuster | Diary retrospectively describes requesting diagnostic evidence | FIC-034, p. 6, entry 82 | Possible outstanding request despite earlier upload | Request reported; transmission, scope, and receipt unverified | Locate outgoing request and response / paralegal |
| E-025 | Letter Apr. 15, 2026; insured receipt Apr. 17; entry unknown | Claims supervisor | Denial states diagnostic evidence was not supplied | FIC-041, p. 1 ¶3; FIC-042, p. 1 | Tests stated rationale against portal acknowledgment | Letter and receipt supported; dispatch and review set unknown | Obtain approval record and reviewed materials / counsel |
The next decision changes from “argue the report was ignored” to “verify what was uploaded and available.” The acknowledgment does not establish contents or review. The diary supports a reported request, not proven transmission; the request might concern different or additional information. Counsel should resolve those gaps before characterizing the investigation. An unreadable or unrelated attachment would materially change E-014’s significance. A usable report would still require evidence about its availability and treatment.
Common mistakes
- Using diary-entry dates as event dates. Preserve both and seek contemporaneous corroboration.
- Treating export silence as inactivity. Check repository coverage, attachments, vendor records, and audit histories.
- Backdating later explanations. Date each rationale when expressed and distinguish earlier available evidence.
- Calling every interval unreasonable delay. Establish receipt, endpoints, and counsel-validated requirements first.
- Recording conclusions instead of conduct. Replace “ignored evidence” with documented delivery, decision, and unresolved review questions.
Final quality check
- Every material proposition has a retrievable source and pinpoint citation.
- Event, receipt, and entry dates are distinguished; unknown dates remain explicit.
- Knowledge, access, and review are not conflated.
- Favorable and adverse sources, versions, and conflicts are reconciled or flagged.
- Interval calculations have reproducible endpoints and assigned legal validation.
- Shared versions control privileged analysis and restricted material.
- Evidentiary gaps and consequential open issues are resolved or assigned specific owners and actions.
Complete the workflow with DecoverAI
DecoverAI is the Legal Intelligence Platform for litigation and transactions. Use its chronology capability alongside document review and evidence analysis to support claim-file sequencing, then carry verified questions into deposition preparation. Counsel retains responsibility for source verification, privilege decisions, and legal significance. To discuss this workflow, book a demo.
Frequently asked questions
Should the chronology include every claim-file entry?
No. Include events needed to answer the defined questions, test competing accounts, and preserve context. Retain the source inventory so excluded administrative entries remain retrievable if their significance changes.
How should we handle an undated adjuster note?
Assign an event ID and mark the date unknown. Record a supported date range without converting it into an exact date. Seek audit metadata or corroboration before treating it as pre-decision knowledge.
Can the internal chronology become an evidentiary summary?
Only after separate analysis. Federal Rule 1006 concerns summaries proving the content of voluminous admissible materials that cannot conveniently be examined in court, and requires underlying originals or duplicates to be available for examination or copying. Illustrative aids instead fall under Rule 107 (Federal Rules of Evidence). Remove internal analysis and assess the intended use. (uscourts.gov)
Where should missing reports appear?
Record the documented reference or transmission, then identify the missing report as a gap. Do not invent its conclusions. Link affected events so obtaining the report triggers reassessment of relevant decision points.
Sources
- Federal Rules of Civil Procedure, Rules 26(b)(1) and 26(b)(5)(A).
- Federal Rules of Evidence, Rules 901(a), 803(6), 1006, and 107.
- California Department of Insurance, 2026 disaster-adjusting guide, p. 19.
Scope: General professional workflow guidance using the October 13, 2026 research cutoff; California guidance is jurisdiction-specific.
This guide is general information about legal workflows, not legal advice for any matter. It was drafted and reviewed with AI assistance. The worked example is fictional. Contract rights and procedure depend on the governing law, the actual wording, and the facts, so check the cited sources and the rules that apply in your jurisdiction before relying on it.
